ASL Wiki
Architecture and Design of a Fault-tolerant Spiking Neural Network Architecture
Background and Research Goal†
Research schedule†
Step 10 (due date 5pm July 31, 2018)†
- Survey FT SNN
- Develop multicast faul-torance (Slide of proposed FT-KMCR, (9/21/2018, Time: 16:00 PM) (
pptx
pdf))
- PORT all previously developed fault-tolerant hardware machanisms to the 3DNoC-SNN
- Consider submission of this result to IEEE transaction (due date by Aug 31, 2018)
Step 11:†
- Real brain model: 3DNoC-SNN for a real application, such as robot control, Basal Ganglia, etc.
Achievement†
On-going Conference and Jnl papers†
Conferences†
Journals†
- Journal article title:Comprehensive Analytic Performance Assessment and Low-latency Algorithm for Spike Traffic Routing in 3D-NoC of Spiking Neurons (3DNoC-SNN)
- Submitted to ACM JETC version (7/15/2018, Time: 2:40 PM) (
latex
pdf)
- Revised version (12/8/2018, Time: 5:40 PM) (
latex
pdf
pdf)
- Journal article title:A Comprehensive Analytic Performance Assessment and High-throughput Low-latency Spike Routing Algorithm for Spiking Neural Network Systems
- Submitted to Supercomputing JnL (7/17/2018, Time: 5:10 PM) (
latex
pdf)
- IEEE Access: Fault-Tolerant + KMCR Multicast Routing Algorithm
- First draft version (12/20/2018, Time: 11:20 AM) (
latex
pdf)
- Complete draft version (1/10/2019, Time: 20:30 PM) (
latex
pdf)
Accepted Conference papers†
- NASH_CNN_camera_final (11/14/2017, Time:9:20 PM) (
latex
pdf)
- Presentation slide (1/19/2018, Time:2:20 PM) (
pptx
pdf)
-
- Camera-ready version (12/19/2018, Time:12:10 PM) (
latex
pdf)
Survey reports†
- NASH poster v1.0 (6/22/2017, Time:7:00 PM) (
pptx,
pdf)
- NASH poster v2.0 (10/10/2017, Time:11:15 AM) (
pptx,
pdf)
- CNNtoSNN survey (7/3/2017, Time:2:00 PM) (
pdf)
- Abstract of Research Progress (11/27/2017, Time:2:15 PM) (
pdf)
- FPGA price (5/25/2017, Time:10:30 AM) (
xlsx)
Update History†
- 07/30/2018: B. (Updated the schedule)
- 05/22/2018: B.
- 11/08/2017: B.
- 5/29/2017: B.
- 3/24/2017: site updated, B.
- 3/10/2017: site updated, B.
- 3/6/2017: site updated, B.
- 2/17/2017: site update, B.
- 1/13/2017: added new ref, B.
- 12/8/2016: updated the research step deadlines, B.
- 12/6/2016: updated the research goal and the background, B.
- Nov. 24,2016, updated Step 1.2, B.
- Nov. 22,2016, Ref. added to Step 2, B.
- Nov. 18, 2016, site updated, Ben
- Nov. 11, 2016 - Research Schedule updated, B.
- Nov. 8, 2016 - page created, B.