Low-Power Scalable Spike-based Neuo-inpisred Network System with Scalable Packet-Switched Network
Background and Research Goal†
Research schedule†
Step 9†
- Multicast Routing Algorithm paper: 1st draft version (4/11/2018, Time: 12:20 PM) (
latex
pdf)
- Propose the Multicast Fautl-tolerance NoC System.
- Add comparison between 2D vs 3D (due date April 30, 2018).
- iCAST conference (and to Journal).
Step 10†
- Draf a Jnl paper about MCFT router
- Merge optimized MC routing algorithm/router to the FT algorithms/router, re-evaluate and make comparison again.
- Design and evaluate FT Tile (due date May 31, 2018).
- Submit the Jnl paper to Journal of Supercomputing or IEEE (due date June 15, 2018)
Achievement†
On-going Conference and Jnl papers†
- Article tentative title: Light-weight Fault-tolerant Multicast Routing Algorithm and Architecture for Manycore Neuro-inpisred System
- Target completion deadline of the 1st draft: November 24, 2017.
- Pelase present your complete algorithm proposal by October 6, 2017
- Multicast Routing Algorithm paper: 1st draft version (3/19/2018, Time: 1:50 PM) (
latex
pdf)
- Multicast Routing Algorithm paper: 2nd draft version (3/23/2018, Time: 6:20 PM) (
latex
pdf)
- Journal article tentative title: Low-latency 3D-NoC Design and High Throughput Multicast Routing Algorithm for Scalable Neuro-inspired Architectures in Hardware
- Multicast Routing Algorithm paper: 1st draft version (4/11/2018, Time: 12:20 PM) (
latex
pdf)
Accepted Conference papers†
- NASH_CNN_camera_final (11/14/2017, Time:9:20 PM) (
latex
pdf)
- Presentation slide (1/19/2018, Time:2:20 PM) (
pptx
pdf)
Survey reports†
- NASH poster v1.0 (6/22/2017, Time:7:00 PM) (
pptx,
pdf)
- NASH poster v2.0 (10/10/2017, Time:11:15 AM) (
pptx,
pdf)
- CNNtoSNN survey (7/3/2017, Time:2:00 PM) (
pdf)
- Abstract of Research Progress (11/27/2017, Time:2:15 PM) (
pdf)
- FPGA price (5/25/2017, Time:10:30 AM) (
xlsx)
Update Record†
- 11/08/2017: B.
- 5/29/2017: B.
- 3/24/2017: site updated, B.
- 3/10/2017: site updated, B.
- 3/6/2017: site updated, B.
- 2/17/2017: site update, B.
- 1/13/2017: added new ref, B.
- 12/8/2016: updated the research step deadlines, B.
- 12/6/2016: updated the research goal and the background, B.
- Nov. 24,2016, updated Step 1.2, B.
- Nov. 22,2016, Ref. added to Step 2, B.
- Nov. 18, 2016, site updated, Ben
- Nov. 11, 2016 - Research Schedule updated, B.
- Nov. 8, 2016 - page created, B.