ASL Wiki
Low-Power Scalable Spike-based Deep Neural Network System with Scalable Packet-Switched Network
Research schedule†
Step 7: A Scalable Fault-tolerant Multicast Routing Algorithm and Architectyure for for NASH Sytem†
- Step 7.1: Study related works, (due date: Sept. 30)
- Step 7.2: Propose a router architecture (due date: Oct.
10 6)
- Step 7.3: Implement a whole network architecture (due date: Oct. 31)
- Step 7.4: Evaluate the routing algorithm and write a draft conf. paper (due date: Nov.
30 24)
Step 8: An Enfficient Lighweight Fault-tolerant Multicast (3D)-Router for NASH Sytem†
- Step 8.1: Survey and report,(due date: Dec. 8, 2017.)
- "Adaptive Routing Strategies for Large Scale Spiking Neural Network Hardware Implementations", Proc. 21th Int'l Conf. Artificial Neural Networks, pp. 77-84, 2011, S. Carrillo, J. Harkin, L. McDaid, S. Pande, S. Cawley, F. Morgan,
- "A Reconfigurable and Biologically Inspired Paradigm for Computation Using Network-On-Chip and Spiking Neural Networks," International Journal of Reconfigurable Computing, vol. 2009, pp. 1-13, J. Harkin, F. Morgan, L. McDaid, S. Hall, B. McGinley, and S. Cawley,
Pelase make a presentaiton about this survey on Dec. 8, 2017.
- .Step 8.2
- .
- .
- .Step 8.?: Evalation (Area and Power with Synopsis DC, and performance with verilog RTL, etc. ) of the Adaptive Multicast 3D Router and draft a conference paper. (due date: January 10. 2018)
Achievement†
On-going Conference and Jnl papers†
- Article tentative title: Light-weight Fault-tolerant Multicast Routing Algorithm and Architecture for Manycore Neuro-inpisred System
- Target completion deadline of the 1st draft: November 24, 2017.
- Pelase present your complete algorithm proposal by October 6, 2017
Accepted Conference papers†
- NASH_CNN_camera_final (11/14/2017, Time:9:20 PM) (
latex
pdf)
Survey reports†
- NASH poster v1.0 (6/22/2017, Time:7:00 PM) (
pptx,
pdf)
- NASH poster v2.0 (10/10/2017, Time:11:15 AM) (
pptx,
pdf)
- CNNtoSNN survey (7/3/2017, Time:2:00 PM) (
pdf)
Update Record†
- 11/08/2017: B.
- 5/29/2017: B.
- 3/24/2017: site updated, B.
- 3/10/2017: site updated, B.
- 3/6/2017: site updated, B.
- 2/17/2017: site update, B.
- 1/13/2017: added new ref, B.
- 12/8/2016: updated the research step deadlines, B.
- 12/6/2016: updated the research goal and the background, B.
- Nov. 24,2016, updated Step 1.2, B.
- Nov. 22,2016, Ref. added to Step 2, B.
- Nov. 18, 2016, site updated, Ben
- Nov. 11, 2016 - Research Schedule updated, B.
- Nov. 8, 2016 - page created, B.