NASH: Neuro-inspired ArchitectureS in Hardware Project
ASL Wiki
Doctoral Topic: Adaptive Highly Reconfigurable Deep Learning Processor for Spiking Neural Networks with Scalable Packet-Switched Network
Research Goal†
The goal of this Doctoral thesis is to research and implement an adaptive and low-power Deep Spiking Neural Networks Processor based on the OASIS Scalable Packet-Switched Network. In particular, the research consists of:
- (1) An efficient adaptive configuration method which enables reconfiguration of different SNN parameters (spike weights, routing, hidden layers, topology, etc.)
- (2) A mixture of different DNN topologies (CNN and RNN) shall be investigated
- (3) Efficient on-chip learning Algorithm
- (4) To demonstrate the performance of the algorithms and the system, an FPGA implementation shall be developed and interfaced to a small drone. In addition, a VLSI implementation shall be also developed.
Research schedule†
Step 5 Due date: March 10 13, 2017. (Please prepare .ppt slides and make a presentation)†
- Step 5.1
- Describe the overall system organization and
Propose a light-weight learning algorithm for NASH System. (NASH stands for 'Neuro-inspired ArchitectureS in Hardware' Project in ASL)
- Step 5.2 Due date: April 30, 2017. Please prepare 8 to 10 pages draft and make a presentation without slides.
- Draft a conference paper about Acceleration (using FPGA) of Image Recognition with Deep Convolution Neural Network based on FT Packet Switched Network.
Achievement†
Survey reports†
RPS†
CFP†
- rtcsa2017, Aug 16, 2017 - Aug 18, 2017, Hsinchu, Taiwan, Submission Deadline Apr 14, 2017.
- AICCSA2017, Oct 30, 2017 - Nov 3, 2017, Hammamet, Tunisia, Submission Deadline May 10, 2017.
- mlsp2017. Sep 25, 2017 - Sep 28, 2017, Tokyo. Submission Deadline: May 28, 2017
Site Updates Record†
- 3/10/2017: site updated, B.
- 3/6/2017: site updated, B.
- 2/17/2017: site update, B.
- 1/13/2017: added new ref, B.
- 12/8/2016: updated the research step deadlines, B.
- 12/6/2016: updated the research goal and the background, B.
- Nov. 24,2016, updated Step 1.2, B.
- Nov. 22,2016, Ref. added to Step 2, B.
- Nov. 18, 2016, site updated, Ben
- Nov. 11, 2016 - Research Schedule updated, B.
- Nov. 8, 2016 - page created, B.